APRIL KAL --- FINAL DAY - DAY 3

Community Leader
Registered: 03-18-1999
APRIL KAL --- FINAL DAY - DAY 3
Sun, 04-29-2012 - 8:02am

Two ways to finish it off:


1) Transfer sts evenly between two DPNs and graft them together using the kitchener stitch.
OR
2) Turn work inside-out, transfer sts evenly between two DPNs and close it off using a three needle bind-off.

 ---------------------------

SUPPLIES NEEDED TO FINISH -


**About 1 yard/meter of matching or contrasting ribbon
**Two 8"x8" squares of tulle to match the ribbon
**About 1/4 cup of dried lavender flowers or potpourri


--------------------


Weave in the loose yarn ends with a yarn needle and you're done with the knit part.

**Lay out the two tulle squares, one on top of the other, put the lavender in the middle and tie it up in a little pouch. Stuff it inside the knit pouch.
**Fold the ribbon in half and tie off a 3-4 inch loop. Use a yarn needle to weave ribbon through the eyelet row of the knit pouch with loop in the center back. Pull loosely and tie in a pretty bow with ends hanging down and tulle sticking out the top.

 

 

 

Here is the link to the Lavender Knit Sachet pattern and pictures.  I  hope you enjoyed this one!!!!

 

Community Leader - Women At Work Board